First Hill Streetcar – Weekly Project Updates This Week: September 24th – September 30th

Full PDF copies of these updates are attached:

Weekly Project Update – Jackson #16.5

Weekly Project Update – Yesler #20

Weekly Project Update – Broadway #23

 

BROADWAY SEGMENT – CONSTRUCTION DETAIL

Weekend Intersection Closure at Broadway and Union

Weekday Work:

  • Denny to Howell
    • o Street restoration
  • Pine to Madison
    • o Trackway construction

• Madison to Columbia

  • o Storm drain and electrical duct bank installation
  • Jefferson intersection
    • o Electrical duct bank installation

Weeknight Work:

  • Madison intersection
    • o Storm drain installation

Weekend Work:

  • Union intersection
    • o Trackway construction

Traffic Advisory:

  • The intersection of Broadway and Union will be closed, with the exception of one northbound lane, the weekend of September 29th and 30th.
  • Broadway will be closed between Madison and Marion from 8:00 p.m. to 6:00 a.m. for up to two weeks beginning September 27th. There will be a signed detour.

Work Hours:

  • Weekdays  7:00 a.m. – 4:00 p.m.
  • Weeknights  8:00 p.m. – 6:00 a.m.
  • Saturday  7:00 a.m. – 7:00 p.m.
  • Sunday  8:00 a.m. – 5:00 p.m.

 

14TH/YESLER SEGMENT – CONSTRUCTION DETAIL

Expect Traffic Delays This Week on Yesler at 10th

Weekday Work:

  • Yesler – Broadway to Boren
    • o Water main installation
  • Yesler – 12thto 14th
    • o Traffic signal work
  • Jackson – 8th to 10th
    • o Water main installation

Work Hours:

  • Weekdays – 7:00 a.m. – 7:00 p.m.

 

JACKSON SEGMENT – CONSTRUCTION DETAIL

Water Main, Storm Drain, and Electrical Duct Bank Installation

Weekday Work:

  • Electrical duct bank installation between 1st and 2nd   
  • Water main installation between 6th and 7th
  • Water main installation between 8th and 10th

Weekend Work:

  • Electrical duct bank and vault installation between 1st and 2nd
  • Water main installation between 6th and Maynard
  • Storm drain installation at 8th Avenue intersection
  • Work Hours:
  • Weekdays 7:00 a.m. – 4:00 p.m.
  • Weekend 7:00 a.m. – 6:00 p.m.

Note on Water Main Shutoffs:

October 6th – 7th will begin the first of three weekend water shutoffs in October for the Chinatown/International District. The shutoffs will begin at 10:00 p.m. on Saturdays and continue until 10:00 a.m. on Sundays. If your building will be affected you will receive a notice directly from Seattle Public Utilities at least 72 hours in advance.

 

More information at http://www.seattlestreetcar.org/firsthill.htm

Waterfront snapshot through Thursday, Sept. 27

Construction overview

  • No significant work is planned at the waterfront this week. For a weekly update of the latest traffic closures, please visit our webpage.

 

Continuing work

  • Ongoing work to install underground monitoring equipment, which is a part of a comprehensive program, helps crews minimize ground movement and protect structures during tunneling. During the upcoming week, work in this program will occur:
    • 7 a.m. to 5 p.m. Monday through Friday: Crews will shift the southbound lane on Western Avenue between Columbia and Marion streets. Two-way traffic will be maintained.
    • 7 p.m. to 5 a.m. Monday through Friday: Marion Street will be reduced to one lane between Western Avenue and Post Alley.
  • Viaduct reinforcement work continues. All southbound lanes of the viaduct from the north end of the Battery Street Tunnel to the West Seattle Bridge will be closed nights from 9 p.m. to 5 a.m. Sunday through Thursday.

 

Upcoming events

        Seattle Seahawks vs. Green Bay Packers (Century Link)

  • Mon., Sept. 24, 5:30 p.m.

        Washington Huskies vs. Stanford Cardinal (Century Link)

  • Thur., Sept. 27, 6 p.m.

First Hill Streetcar – Weekly Project Updates This Week: September 17th – September 23rd

BROADWAY SEGMENT – CONSTRUCTION DETAIL

Weekend Detour of Pike at Broadway

Weekday Work:

  • · Howell  – Broadway to Nagel
    • o Electrical duct bank installation
  • · Pine to Madison
    • o Trackway construction
    • o Traffic signal work

• Madison to Columbia

  • o Storm drain installation
  • · Jefferson intersection
    • o Electrical duct bank installation

Weekend Work:

  • · Pike intersection
    • o Trackway construction

Traffic Advisory:

  • · Pike will be closed at Broadway on the weekend of September 22nd and 23rd with right turns permitted at Broadway.
  • · Broadway will be closed between Madison and Marion from 8:00 p.m. to 6:00 a.m. for up to two weeks beginning September 24th. There will be a signed detour.

Work Hours:

  • Weekdays  7:00 a.m. – 4:00 p.m.
  • Saturday  7:00 a.m. – 7:00 p.m.
  • Sunday 8:00 a.m. – 5:00 p.m. 

14TH/YESLER SEGMENT – CONSTRUCTION DETAIL

Expect Traffic Delays This Week on Yesler at 10th

Weekday Work:

  • Broadway at Alder
    • o Electrical duct bank and storm drain installations
  • Yesler at 10th
    • o Sewer installation
  • Yesler – 12thto 14th
    • o Traffic signal work
  • Jackson – 8th to 10th
    • o Water main installation

Work Hours:

Weekdays – 7:00 a.m. – 7:00 p.m.

 

JACKSON SEGMENT – CONSTRUCTION DETAIL

Water Main, Storm Drain, and Electrical Duct Bank Installation

Weekday Work:

  • Electrical duct bank installation between 1st and 2nd   
  • Storm drain installation between 6th and Maynard
  • Water main installation between 8th and 10th

Weekend Work:

  • Electrical duct bank installation between 1st and 2nd
  • Water main installation between 6th and Maynard
  • Storm drain installation at 8th Avenue intersection

Work Hours:

  • Weekdays 7:00 a.m. – 4:00 p.m.
  • Weekend 7:00 a.m. – 6:00 p.m.

Note Regarding Water Main Installation:

Beginning in early October there will be water service interruptions as new connections are made along Jackson. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.

 

More information at http://www.seattlestreetcar.org/firsthill.htm